Truck Tire Shipping & CIF Quotes | BRF Logistics
BRF LOGISTICS · COMMERCIAL TIRE IMPORTS

Truck Tire Sea Freight & CIF Shipping: Container Plans, Costs and Insurance

A useful truck tire quotation should explain how the cargo will be loaded, how many containers are required, what ocean freight and marine insurance cost, when the shipment is expected to arrive and how long the price remains valid.

For tire wholesalers, distributors, fleet suppliers and manufacturers, BRF Logistics can coordinate a shipping plan around cargo dimensions, order quantity, factory pickup and destination requirements.

Request a Truck Tire Freight Quote

Planning guide · All numerical shipment scenarios below are hypothetical, not current freight offers or completed BRF shipment cases.

What Should a Truck Tire Sea Freight Quotation Include?

A quote stating only “CIF price per tire” makes it difficult to compare suppliers. Ask for a cargo specification sheet and a separate logistics breakdown so that the container recommendation, shipping cost and receiving responsibilities can be checked.

Cargo & Loading

Tire model, quantity, actual outside diameter and width, weight, packaging, recommended container type and quantity, proposed arrangement and maximum approved load.

Cost & Coverage

Origin charges, ocean freight, included carrier surcharges, insurance premium, insured amount, coverage clauses and a clear list of exclusions.

Schedule & Validity

Origin and destination ports, direct or transshipment service, estimated transit, cargo cutoff, sailing window, quote expiry and the event that determines rate validity.

Start with BRF’s sea freight services 以及 FCL shipping guide for full-container orders.

CIF for Truck Tires: Cost Responsibility and Risk Transfer

CIF means Cost, Insurance and Freight. Write the sales term in full: CIF [named destination port], Incoterms® 2020. The seller arranges export formalities, freight to that port and cargo insurance. The seller’s obligation to pay these costs does not mean that transport risk stays with the seller until arrival.

Risk transfers when the goods are on board the vessel at the port of shipment. CIF applies to sea and inland waterway transport. For containerized tires handed to a carrier at a terminal before loading, consider CIP with the seller and buyer: it better matches multimodal container movements and uses a different delivery/risk point.

CIF normally requires Institute Cargo Clauses (C) or equivalent minimum coverage, with an insured amount of at least 110% of the contract price. Broader Clauses (A) cover can be agreed. Coverage still depends on exclusions, deductibles and policy wording; “all risks” does not cover every possible loss.

See the ICC Academy explanation of CIF and CIP 以及 Maersk’s CIF guide. BRF’s Incoterms guide provides related trade-term context.

项目CIF treatmentWhat the quotation must clarify
Export clearance and origin deliverySeller arranges export and delivery on boardPickup, stuffing, origin terminal, documentation and loading charges
海运Seller pays to named destination portEquipment count, service, surcharges and prepaid/collect allocation
Marine insuranceSeller arranges required coverInsured value, clauses, voyage, beneficiary, deductible and claims contact
Destination unloading / terminal handlingDepends on carriage contract allocationState whether included in prepaid freight or payable by buyer; avoid duplicate charges
Import clearance, duties and taxesNormally buyer responsibilitySeparate destination broker and tax assessment
Port-to-warehouse deliveryNormally buyer responsibilitySeparate inland quote, unloading method and container return

20GP, 40GP or 40HQ: Which Container Fits Truck Tires?

New truck tires often consume substantial space relative to weight. A 40HQ can be attractive when its additional height creates usable rows or layers. However, an extra layer must fit the tire geometry and the supplier’s stacking limits. Rim-mounted wheels, mixed sizes and heavy products can change the limiting factor.

设备Approximate internal L × W × HNominal internal volumePlanning use
20GP5.90 × 2.35 × 2.39 mAbout 33 m³Smaller FCL orders; check weight before adding units
40GP12.03 × 2.35 × 2.39 mAbout 67 m³Large orders where extra height provides little benefit
40HQ / 40HC12.03 × 2.35 × 2.70 mAbout 76 m³Volume-sensitive orders with a validated loading arrangement

Rounded planning references only. Equipment varies by manufacturer. Verify door opening, actual payload, container safety plate, carrier limits, axle/road limits and equipment availability. Nominal cubic capacity is not usable tire capacity. See Hapag-Lloyd’s sample 40HC specifications.

Loading Methods to Compare

  • Loose floor loading: tires are arranged without pallets. Confirm handling labor, receiving capacity, blocking and manufacturer-approved stacking.
  • Approved interlaced loading: alternate tire positions only when the manufacturer accepts the method and a physical trial demonstrates capacity without bead or sidewall damage.
  • Palletized loading: simpler unit handling but packaging and voids can reduce tire count. Include pallet dimensions, gross weight and any applicable wood-packaging treatment requirements.
  • Mixed-size loading: issue a separate count by SKU and position; a single average size may hide unusable gaps and access problems.

Do not assume that tire nesting or compression is permitted. Use manufacturer approval and an unloading plan before proposing any deformation or nesting process.

How to Calculate Container Quantity and Loading Capacity

Collect the actual dimensions rather than relying only on the size marked on a tire. For a conservative flat-stacking screening model, use the outside diameter as the floor footprint and tire width as the vertical increment.

Geometric count = floor(L ÷ D) × floor(W ÷ D) × floor(H ÷ T)
Weight count = floor((permitted cargo mass − packaging / securing mass) ÷ tire mass)
Planning count = lower of trial-approved geometric count and weight count
Container quantity = ceiling(order quantity ÷ planning count)

Hypothetical single SKU: outside diameter D = 1.08 m; tire width T = 0.30 m; net weight = 60 kg per tire; order = 300 tires. No rims. These assumptions are chosen for arithmetic demonstration and are not a specification for a named tire model.

容器Simple geometric screeningCount / containerNet tire weight at countContainers for 300 tires
20GP5 × 2 × 7704,200 kg5
40GP11 × 2 × 71549,240 kg2
40HQ11 × 2 × 9198 theoretical11,880 kg2
The 40HQ calculation uses the full nominal height: 9 × 0.30 m = 2.70 m, leaving no clearance. It is not an executable load plan. Reducing to eight layers gives 176 units before any further allowance. Door access, stacking stability, securing, dimensional tolerance and safe unloading must be checked. The comparison below therefore assumes a separately trial-approved 40HQ capacity of 170 tires.

For mixed cargo, calculate each SKU separately, then validate the combined layout. Keep an allowance for securing and handling; do not apply a generic utilization percentage and call it a guaranteed load count.

Scenario Data: Compare Five Truck Tire Shipping Plans

Illustrative order: 300 tires × USD 120 FOB per tire = USD 36,000 FOB value; net tire weight = 18,000 kg. All freight rates, approved capacities, insurance rates and scheduling windows below are invented planning inputs. They are not live BRF prices, universal loading capacities or route forecasts. Origin costs are already included in the assumed FOB value.

PlanCapacity assumptionEquipment / arrangementAssumed ocean freightCalculated insurance*Illustrative CIF total
A · Small-container FCL70 tires / 20GP5 × 20GP; 60 tires each5 × $1,200 = $6,000$139.06$42,139.06
B · Standard 40-foot FCL150 tires / 40GP2 × 40GP; 150 each2 × $1,800 = $3,600$131.11$39,731.11
C · High-cube FCL170 tires / 40HQ, subject to trial2 × 40HQ; 150 each2 × $1,950 = $3,900$132.11$40,032.11
D · Palletized FCL120 tires / 40HQ, hypothetical3 × 40HQ; 100 each3 × $1,950 = $5,850$138.56$41,988.56
E · LCL sensitivity check105 measured packaged m³ assumed; 18 t netRate on 105 revenue tons at assumed 1 m³ : 1 t basis105 × $75 = $7,875$145.27$44,020.27

*Insurance assumes 0.30% of 110% of final CIF value, with no minimum premium. Totals are rounded to cents. Plan D assumes its FOB value already includes pallet packaging; if not, add it. LCL uses a hypothetical chargeable volume, not the circular tire material volume; actual packaged dimensions, gross weight, rounding, minimums and tariff basis control. LCL destination/CFS charges are excluded and must be quoted separately.

Interpretation: under these inputs, Plan B has the lowest modeled CIF total at $132.44 per tire. Plan C provides spare trial-approved capacity but does not reduce container count for a 300-tire order. Plan D adds equipment cost while improving unit handling. Plan E illustrates why comparing only an LCL rate per cubic meter can mislead a buyer.

For a smaller order, compare the actual all-in costs using BRF’s LCL shipping service. Include origin consolidation, destination handling, insurance, labor and delivery in the same comparison boundary.

CIF Cost and Marine Insurance Calculation

The seller’s CIF product price includes goods, the relevant origin obligations, freight and insurance. BRF’s forwarding quote covers the agreed logistics services; it does not establish the manufacturer’s tire sale price.

If premium is charged on 110% of final CIF value:
CIF = (FOB value + freight) ÷ (1 − 1.10 × insurance rate)
Insurance premium = CIF × 1.10 × insurance rate

For Plan B: ($36,000 + $3,600) ÷ (1 − 1.10 × 0.003) = $39,731.11. Premium = $131.11; insured amount = $43,704.22. If the insurer uses a different valuation basis, minimum premium or fixed policy fee, use its actual quotation instead.

Insurance Instructions for a Tire Shipment

Specify whether the policy covers factory pickup, warehouse handling and inland legs as well as the sea voyage. Request the exact coverage clauses, deductible, exclusions, currency and buyer’s claims rights. Discuss theft, wet damage and handling damage explicitly; minimum CIF cover does not automatically address every loss concern.

Record tire condition and quantity before loading, retain dated loading photographs, container inspection, seal details and packing lists. If a loss occurs, notify the insurer and carrier promptly, preserve evidence and follow survey and claim deadlines. The policy determines whether any particular loss is payable.

Transit Time: Separate Sailing Time from the Full Shipping Schedule

A port-to-port estimate starts at vessel departure and ends at arrival at the destination port. It excludes production, pickup, cargo cutoff, waiting for a sailing, destination release and inland delivery. List each stage separately.

StageHypothetical planning allowanceQuote control
Pickup, stuffing and origin documents2–4 calendar daysAfter cargo readiness; subject to factory slot and export clearance
Terminal acceptance to departure2–5 calendar daysCarrier cutoff, equipment and booked sailing
Direct sea legExample: 25–35 calendar daysReplace with named route, vessel/service and current schedule
Alternative transshipment legExample: 32–45 calendar daysConnection window and hub dwell; alternative to direct leg
Arrival release and optional inland delivery3–7 calendar daysImport clearance, inspections, terminal access and receiver slot

Using the hypothetical direct service above gives a sequential pickup-to-door allowance of 32–51 days; using the transshipment alternative gives 39–61 days. These are examples of how to sum stages, not estimates for an unspecified destination. Some activities overlap, and disruptions can extend the schedule. Production time is excluded.

Ask for ETD, ETA, direct/transshipment status, cutoff dates and destination free time. Confirm whether free time is demurrage, detention or combined, how it is counted and what charges apply afterwards.

Quote Validity and a Reviewable CIF Quotation Template

A rate expiry date must identify the event it applies to: booking acceptance, gate-in or sailing date. Cargo ready within the validity period does not automatically secure a rate. Equipment, space and carrier acceptance must also be confirmed.

Quotation fieldSample entry — hypothetical only
Reference / currencySAMPLE-TIRE-CIF-001 / USD
Sales termCIF [insert named destination port], Incoterms® 2020
货物300 new truck tires, single SKU; D 1.08 m × width 0.30 m; 60 kg each; 18,000 kg net
Recommendation / loading2 × 40GP; 150 tires each; loose loading subject to supplier-approved trial layout and securing plan; packaging/VGM to be finalized
Ports / service[Origin port] → [destination port]; insert actual carrier service and connection details
海运Illustration: $1,800 / 40GP × 2 = $3,600; identify every included surcharge
保险Illustration: $131.11; insured amount $43,704.22; 0.30% rate; agree clauses, exclusions, deductible and voyage
Seller’s CIF sale amountIllustration: $39,731.11 based on supplier FOB amount $36,000; $132.44 / tire
Transit / departure[Actual port-to-port days], ETD [date], ETA [date]; schedule subject to carrier confirmation
Validity wordingExample: valid for sailings from [date] through [date], inclusive, subject to confirmed space and equipment; booking and gate-in deadlines listed separately
目的地费用Import clearance, duties/taxes, inland delivery and storage excluded; state unloading/terminal allocation under actual freight contract
Change conditionsRequote for changes to quantity, dimensions, packing, ports, service, sailing window or insurance requirements

Do not use “all-in CIF” without listing its cost boundary. If a shipment starts from an EXW supplier price, add pickup, export handling and other seller-origin obligations before calculating the CIF total; do not add those costs again when already included in an FOB input.

Alternative Trade and Delivery Plans

PlanWhen to discuss itData required to compare
FCA + buyer-arranged freightBuyer wants control of a container transport contractNamed carrier handover point, origin scope, freight and buyer’s insurance
FOB + buyer freight/insuranceContract calls for on-board delivery; review suitability for containersOrigin on-board cost, freight and buyer’s policy
CFRSeller pays sea freight; buyer arranges insuranceSame freight scope as CIF plus separate buyer premium
CIFSales contract uses sea-only delivery on board and seller insuranceNamed port, freight, minimum or agreed upgraded cover
CIPContainer / multimodal carriage with seller insuranceNamed destination and carrier delivery/risk point; normally Clauses (A) cover
DAP / DDP door deliveryBuyer needs warehouse delivery instead of port-only serviceFull address, importer arrangements, tax scope, access and unloading; DDP requires seller import-clearance capability

Compare both price and risk-transfer point. A door delivery service is an additional scope to a CIF port shipment unless the sales contract adopts an appropriate door-delivery term.

BRF’s Truck Tire Shipping Workflow

  1. Review cargo: collect SKU dimensions, weights, quantities, supplier location and ready date; distinguish new tires, used tires and mounted assemblies.
  2. Validate loading: compare 20GP, 40GP and 40HQ, obtain trial-approved capacity and check road and carrier weight limits.
  3. Prepare options: separate origin charges, freight, insurance and destination options using a consistent cost boundary.
  4. Confirm contract and booking: agree named port/place, trade term, coverage, schedule and validity conditions.
  5. Execute origin handling: coordinate pickup or stuffing, export documents, container inspection, securing, verified gross mass and seal records.
  6. Track and hand over: provide transport documents and arrival information; coordinate destination services when separately agreed.

Product admissibility, labeling and conformity depend on the destination and tire category. Used tires can face different rules from new tires. Have the importer and destination broker confirm eligibility and product-specific duties before dispatch; this planning guide does not establish an HS classification or tax rate.

Explore BRF’s 全球航线 以及 ocean freight services for destination-specific planning.

Truck Tire Sea Freight & CIF FAQs

How many truck tires fit in a 40HQ?

There is no universal count. Actual diameter, width, packaging, manufacturer stacking limits and arrangement determine capacity. The 170-unit assumption in this article is hypothetical and requires physical validation.

Does CIF include import duty and warehouse delivery?

Normally it includes seller-arranged freight and insurance to the named port, while import clearance, duties and inland delivery remain with the buyer. Check destination handling allocation in the carriage contract.

Is 40HQ always cheaper per tire than 40GP?

No. Compare the container count required for the actual order, freight per container and receiving costs. For the 300-tire example, both require two containers and 40GP has the lower assumed rate.

Can a CIF price be calculated without a destination?

A method and a hypothetical example can be prepared, but a usable quote needs the named port, shipment date, cargo details and service requirements.

What should I send BRF for a quotation?

Send tire models and quantities, actual outside dimensions, unit and gross weights, packaging photos, supplier address, destination port or delivery address, cargo ready date, target arrival date and preferred insurance coverage.

Request a Truck Tire Container and CIF Shipping Plan

Send BRF Logistics your tire specification sheet and shipping requirements. Request an equipment recommendation, loading plan, origin cost breakdown, ocean freight, insurance quotation, estimated schedule and explicit rate validity.

联系 BRF 物流

Technical references: ICC Incoterms® 2020; ICC Academy CIF/CIP guidance; Maersk CIF explanation; Hapag-Lloyd container specifications. Linked references describe general rules and sample equipment; the numerical scenarios are original hypothetical calculations.

滚动到顶部
BRF 物流

获取报价